GT- Emix magnetotelluric instrument
EMIX-410 is an earth's electromagnetic field data acquisition and observation system designed specifically for measuring the earth's electric and magnetic fields. It is mainly composed of the host, three-component high-precision vector fluxgate, four-component electric channel acquisition box, GPS, instrument control box, and lightning protection device six parts.
Classification:
Detailed description
| Model |
GT- Emix magnetotelluric instrument |
|
| Host |
Physical Dimensions |
230 × 200 × 110 |
| Weight |
4.2 kg |
|
| Working temperature |
-30~75 ℃ |
|
| Supply voltage |
4.5V~9V |
|
| Temperature Sensor Sensitivity |
0.1℃ |
|
| TF card capacity (FAT-16,FAT-32) |
1GB……32GB |
|
| Host Bandwidth |
~10KHz |
|
| magnetic field sensor |
Magnetic field measurement range |
±75000 nT |
| three-component magnetic field resolution |
15 pT |
|
| Sensitivity |
0.13 V/μT |
|
| zero drift |
< ±5 nT/yr |
|
| temperature drift |
≤ ± 0.3 nt/k |
|
| Noise level |
<10pT/√Hz |
|
| Cable length |
10 m |
|
| Sample Rate (Default) |
20 Hz |
|
| Error range |
0.097 μV |
|
| Digital-to-analog conversion |
32 bit |
|
| electric field sensor |
Electric field measurement range |
±0.1 mV;±5000mV |
| Resolution of Electric Field Change Recorded in TF Card |
0.01 mV/km |
|
| Measure bandwidth |
DC-2KHz |
|
| Error range |
0.095 μV |
|
| Digital-to-analog conversion |
32 bit |
|
(Note: the parameters are for reference only, customized products can be adjusted according to customer needs)
Configuration list:
| Serial Number |
Name |
Quantity |
Unit |
Description |
| 1 |
System Host |
1 |
Taiwan |
|
| 2 |
fluxgate sensor |
1 |
Taiwan |
Standard 10m connection cable |
| 3 |
Electric field acquisition channel unit |
1 |
Sleeve |
|
| 4 |
Host control box |
1 |
One |
Standard cable length 1m |
| 5 |
GPS antenna |
1 |
Root |
|
| 6 |
TF storage unit |
1 |
One |
32GB |
| 7 |
Power connection cable |
1 |
Root |
|
| 8 |
Grounding unit |
1 |
One |
|
| 9 |
Electrical signal connector |
8 |
Right. |
8 pairs of butt plugs; 8 connecting plugs |
| 10 |
Shielding electrical signal lines |
8 |
Root |
Standard length 50m |
| 11 |
High stability non-polarized electrode |
8 |
One |
|
| 12 |
User Manual |
1 |
Dhis |
Electronic version |
(Note: the parameters are for reference only, customized products can be adjusted according to customer needs)
Engineering case:
Case one< Tunnel investigation >
Completed Unit:A company in Tianjin
Project purpose:Selection and Selection of Railway Tunnel Scheme (Crossing Qinling Tunnel)
Using the instrument:EMIX-410
Project results:The total length of the tunnel is 13.3Km. The geophysical exploration results have successfully controlled the development and spatial distribution of 15 fracture zones, delineated poor lithological integrity or fracture zones, rich water zones and Class I and II high-risk zones, and focused on the interpretation of the integrity of the surrounding rock within the height range of the tunnel.

Case II< Tunnel investigation >
Completed Unit:A company in Tianjin
Project purpose:Tunnel investigation
Using the instrument:EMIX-410
Project results:The total length of the tunnel is 10.675Km. Geophysical exploration results have successfully controlled the development and spatial distribution of 4 fracture zones, delineated poor lithological integrity or fracture zones and Class I high-risk zones (31), and focused on interpreting the classification of surrounding rocks within the height range of the tunnel.

Case three< Tunnel investigation >
Completed Unit:A company in Tianjin
Project purpose:Tunnel investigation
Using the instrument:EMIX-410
Project results:The total length of the tunnel is 10.425Km, and the geophysical exploration results have successfully controlled the development and spatial distribution of three fracture zones, delineated poor lithological integrity or fracture zones, Class I high-risk zones (4) and Class II high-risk zones (3), and focused on interpreting the integrity of surrounding rocks within the height range of the tunnel.

Case four< Pumped storage survey >
Completed Unit:A company in Tianjin
Project purpose:Reservoir water conveyance tunnel line survey
Using the instrument:EMIX-410
Project results:The total length of the tunnel is 3.63Km, and the interpretation depth is 1000 m. The geophysical exploration results successfully controlled the development and spatial distribution of the four fracture zones, and delineated the distribution range of granite, tuff, basalt and argillaceous siltstone.

Key words:
Related Solutions
Related Products
Welcome your product consultation
